C1 - Price Based DR and Voluntary Load Control

From SmartGridiPedia

Jump to: navigation, search

Here are price based DR and voluntary load control scenarios:

C1 - Scenario 2 - The AMI Meter does not respond to a voluntary demand response event notification


These scenarios were captured using Sparx Enterprise Architect and have been exported to XML which can be downloaded here (right-click and select "save target as" or "save link as" depending on your browser): Download



Return to Use Cases with Integration Requirements

Personal tools