C1 - Price Based DR and Voluntary Load Control
From SmartGridiPedia
Here are price based DR and voluntary load control scenarios:
C1 - Scenario 2 - The AMI Meter does not respond to a voluntary demand response event notification
These scenarios were captured using Sparx Enterprise Architect and have been exported to XML which can be downloaded here (right-click and select "save target as" or "save link as" depending on your browser): Download
Return to Use Cases with Integration Requirements

