D2 - Distribution Automation
From SmartGridiPedia
Here are distribution automation scenarios:
D2 - Scenario 3 - Capacitor Bank Controller uses the AMI System to optimize Customer voltage
These scenarios were captured using Sparx Enterprise Architect and have been exported to XML which can be downloaded here (right-click and select "save target as" or "save link as" depending on your browser): Download
Return to Use Cases with Integration Requirements

