D2 - Distribution Automation

From SmartGridiPedia

Jump to: navigation, search

Here are distribution automation scenarios:

D2 - Scenario 1 - Distribution Engineering optimizes network based on voltage RMS variation information at the customer site

D2 - Scenario 3 - Capacitor Bank Controller uses the AMI System to optimize Customer voltage


These scenarios were captured using Sparx Enterprise Architect and have been exported to XML which can be downloaded here (right-click and select "save target as" or "save link as" depending on your browser): Download



Return to Use Cases with Integration Requirements

Personal tools